Search This Blog

This is default featured slide 1 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

This is default featured slide 2 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

This is default featured slide 3 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

This is default featured slide 4 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

This is default featured slide 5 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.This theme is Bloggerized by Lasantha Bandara - Premiumbloggertemplates.com.

Thursday, February 16, 2017

Mumbai Local Starts my day with a Hitch and Glitch…! 😓


Mumbai suburban railways has spread over 465 kms. There’s a huge Gap between the Demand and Supply of Local Trains, Mumbai. Capacity of a train is 2500 commuters but, actually 5500 commuters travel during Peak hours.

9 innocent Commuters die EVERY SINGLE DAY.

Reaching Safety of every Commuter is a Challenge for 22 hours a day to the Mumbai Suburban Railways.

To anticipate this, loan of Rs.2500 Crore was taken, by Indian Railways from World Bank, but Project Failed.

Further studying few minor Psychology Terms- Neuroscience, added an Ice to a Cake.

Below Strategies were made:

Placing a board of man who is about to hit the Train right in front of people, which will make you fear.


Attention is more when, there is a Gap between a sound (So now the Honking of train is 7 seconds prior-to train approaches station, goes like Beep—Beep------ Beep)

Creating Yellow lines between the Tracks to draw the attention of the Track Crosser.

Cost Implemented for the entire above mission at 55 different Locations in Mumbai, was just 10K to Mumbai Suburban Railways.

By building similar Missions and Strategies Mumbai Suburban Railways didn’t meet their goals up-to the Mark, as daily Commuters are demanding to increase the number of trains.

Fact is that it is Impossible to Multiply Railways and Extend Road Ways more than this.

Solution to beat back this problem is below:



Mumbai should Start seaways Transportation by Constructing
Jetties.










Sea ways are the Feasible and Finest mode of Transport. Even Terrorist have used this to Attack Mumbai but, was never used to Commute by us.

It is Strongly recommended to companies to Invest their Funds in this Project.

Jetties can be Constructed at below Locations.
  • Bhayander to Borivali to Juhu to Bandra to Dadar. (Ref. black dots)
  • Thane to Gate way of India. (Ref. Green dots)
  • New Bombay- Gateway of India. (Ref. Blue dots)




Happy Reading...! 😉


Thank You.


Links I Used:
https://en.wikipedia.org/wiki/Mumbai_Suburban_Railway
http://www.mid-day.com/search/mumbai-local-train-accident-all
https://www.youtube.com/
https://www.google.co.in/maps/search/map

Quick Note: The Core purpose of this Article was to Re-comment Government and Educate Readers. This Article purely indicates the Facts and Figures of the actual status, doesn't Criticize one.